Notification of Intent to submit MAA
Once eligibility is confirmed, the Letter of Intent (LoI) and request for pre-submission meeting can be submitted, either separately or together. It is possible to submit the eligibility request, LoI and PSM request simultaneously, however it should be borne in mind that whilst this clearly optimises efficiency, sufficient time should be planned between the submission of these documents, the PSM and the intended submission date. Consequently, it is recommended to submit each document in a step-wise fashion where possible. In practice, the Pre Submission Meeting (PSM) often takes much longer than 1 month to arrange and as such, it is advisable to submit this request a few months prior to the minimum 7 months presubmission milestone. Similarly, a little more time between the PSM and submission date can provide additional space to incorporate recommendation made by EMA during that meeting.
Pre‐submission meeting request
Unlike the Scientific Advice and Orphan Drug Designation procedures, the PSM is mandatory for the Centralised procedure. This is an important opportunity to introduce the product to EMA and to ask any procedural questions and can be particularly beneficial if the product is unusual.